BEFORE
Master Shower
Guest Bathroom
Kitchen
DURING
The Master Shower
When we removed the ceiling in the Master Shower, we found a 2nd ceiling covered in mold & mildew.
The 1st ceiling hide the duct work for the vent.
The rest of the Master Shower stripped to the frame work
No more tile floor
A view of the Guest Bathroom from the Bedroom
The Nook
The shower had been leaking for some time. We removed the drywall
Removed the tile floor in the Kitchen
Preparing to install a pocket door between the Guest Bedroom and Bathroom
The new pocket door installed
After removing the moldy drywall in the Master Shower we installed new insulation
Installed a new light in the nook
Framing out the new Master Shower with a 1/2 wall
The pocket door installed and the drywall hung
Laying out the window trim and baseboard to be sprayed in the 1st coat of Semi-Gloss
Spraying the pocket door
The new drywall is installed, tapped & mud in the nook
The Master Shower is looking more like a Shower
We moved the Laundry room door and installed an archway
Kitchen
The owner wanted to remove the 1/2 wall in the Kitchen. And have an island installed.
This meant we had to move the plumbing.
Marking out where the new plumbing would go.
Chipping out the concrete
Digging out the dirt so that the new plumbing can be placed
All plumbed up
The Guest Bedroom was painted in Irish Cream
While the Master was paint in Fancy Pink
AFTER
Master Bath
Master Bedroom
Guest Bathroom
The owner asked for Grab Bars to be installed
Guest Bedroom
Hallway
The Nook
The Dining Room
Looking into the Dinning Room from the Living Room
Looking into the Kitchen from the Living Room
No comments: